Welcome to the IKCEST

Natural Gas Industry B | Vol.3, Issue.5 | 2017-06-24 | Pages

Natural Gas Industry B

Safety time calculation method for “Hang's Mudding-off” operation under circulation loss of returns

Dongchang Fan  
Abstract

The so-called “Hang's Mudding-off” technique is critical to keeping the dynamic pressure balance and guaranteeing the sufficient safe operation time in wellbore. However, for lack of dynamic mathematical model analysis methods for reflecting the changes of annulus liquid level in the borehole during the “Hang's Mudding-off” operation, the actual operation is basically conducted blindly without reasonable engineering basis. According to the actual conditions, a mathematical model for the safe time of the “Hang's Mudding-off” was, for the first time, built up by using the dynamic borehole leakage analysis method. Then, the integral results of leak-off rates were calculated. Finally, the calculation results were verified by field cases. It is shown that the calculation results are highly accordant with the actual data, indicating the reliability of the mathematical model. The safe operation time can be increased by increasing mud amount or reducing mud density appropriately. With this model, the safe time of “Hang's Mudding-off” operation can be calculated accurately. This research result is of great significance to avoiding well control risk of absorption wells, optimizing the “Hang's Mudding-off” technique and reducing project cost.

Original Text (This is the original text for your reference.)

Safety time calculation method for “Hang's Mudding-off” operation under circulation loss of returns

The so-called “Hang's Mudding-off” technique is critical to keeping the dynamic pressure balance and guaranteeing the sufficient safe operation time in wellbore. However, for lack of dynamic mathematical model analysis methods for reflecting the changes of annulus liquid level in the borehole during the “Hang's Mudding-off” operation, the actual operation is basically conducted blindly without reasonable engineering basis. According to the actual conditions, a mathematical model for the safe time of the “Hang's Mudding-off” was, for the first time, built up by using the dynamic borehole leakage analysis method. Then, the integral results of leak-off rates were calculated. Finally, the calculation results were verified by field cases. It is shown that the calculation results are highly accordant with the actual data, indicating the reliability of the mathematical model. The safe operation time can be increased by increasing mud amount or reducing mud density appropriately. With this model, the safe time of “Hang's Mudding-off” operation can be calculated accurately. This research result is of great significance to avoiding well control risk of absorption wells, optimizing the “Hang's Mudding-off” technique and reducing project cost.

+More

Cite this article
APA

APA

MLA

Chicago

Dongchang Fan,.Safety time calculation method for “Hang's Mudding-off” operation under circulation loss of returns. 3 (5),.

References

Disclaimer: The translated content is provided by third-party translation service providers, and IKCEST shall not assume any responsibility for the accuracy and legality of the content.
Translate engine
Article's language
English
中文
Pусск
Français
Español
العربية
Português
Kikongo
Dutch
kiswahili
هَوُسَ
IsiZulu
Action
Recommended articles

Report

Select your report category*



Reason*



By pressing send, your feedback will be used to improve IKCEST. Your privacy will be protected.

Submit
Cancel