Welcome to the IKCEST

The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences | Vol.XLI-B2, Issue. | 2017-05-30 | Pages

The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences

ANALYSIS OF THE PIT REMOVAL METHODS IN DIGITAL TERRAIN MODELS OF VARIOUS RESOLUTIONS

  
Abstract

Digital terrain model (DTM) is the base for calculation of the surface runoff under the influence of the gravity (gravity flow) in hydrological analysis. It is important to produce hydrologically corrected DTM with the removed natural and artificial depressions to avoid numerical problems in algorithms of the gravity flow. The pit removal procedure changes geomorphometry of the DTM. GIS software packages use pit removal algorithm independently of geomorphmetric features of the analyzed area. In need of minimally modified DTM after the pit removal areas, the carving method (deepen drainage routes) and the filling method (fill sink) were analyzed on three different geomorphometric areas (bare mountain range, hilly wooded area and the plain area intersected with the network of the drainage canals). The recommendation is given for the choice of geomorphometric least changing DTM algorithm. The input data are raster data of elevation points created by stereoscopic photogrammetry method in 5x5 and 25x25 meter resolution. Differences have been noticed during the process of creating raster data. The recommendation is given for the choice of the most acceptable method for each type of area on the basis of comparison of the original elevation points with the elevation points in created DTM.

Original Text (This is the original text for your reference.)

ANALYSIS OF THE PIT REMOVAL METHODS IN DIGITAL TERRAIN MODELS OF VARIOUS RESOLUTIONS

Digital terrain model (DTM) is the base for calculation of the surface runoff under the influence of the gravity (gravity flow) in hydrological analysis. It is important to produce hydrologically corrected DTM with the removed natural and artificial depressions to avoid numerical problems in algorithms of the gravity flow. The pit removal procedure changes geomorphometry of the DTM. GIS software packages use pit removal algorithm independently of geomorphmetric features of the analyzed area. In need of minimally modified DTM after the pit removal areas, the carving method (deepen drainage routes) and the filling method (fill sink) were analyzed on three different geomorphometric areas (bare mountain range, hilly wooded area and the plain area intersected with the network of the drainage canals). The recommendation is given for the choice of geomorphometric least changing DTM algorithm. The input data are raster data of elevation points created by stereoscopic photogrammetry method in 5x5 and 25x25 meter resolution. Differences have been noticed during the process of creating raster data. The recommendation is given for the choice of the most acceptable method for each type of area on the basis of comparison of the original elevation points with the elevation points in created DTM.

+More

Cite this article
APA

APA

MLA

Chicago

,.ANALYSIS OF THE PIT REMOVAL METHODS IN DIGITAL TERRAIN MODELS OF VARIOUS RESOLUTIONS. XLI-B2 (),.

References

Disclaimer: The translated content is provided by third-party translation service providers, and IKCEST shall not assume any responsibility for the accuracy and legality of the content.
Translate engine
Article's language
English
中文
Pусск
Français
Español
العربية
Português
Kikongo
Dutch
kiswahili
هَوُسَ
IsiZulu
Action
Recommended articles

Report

Select your report category*



Reason*



By pressing send, your feedback will be used to improve IKCEST. Your privacy will be protected.

Submit
Cancel