The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences | Vol.XLI-B2, Issue. | 2017-05-30 | Pages
ANALYSIS OF THE PIT REMOVAL METHODS IN DIGITAL TERRAIN MODELS OF VARIOUS RESOLUTIONS
Digital terrain model (DTM) is the base for calculation of the surface runoff under the influence of the gravity (gravity flow) in hydrological analysis. It is important to produce hydrologically corrected DTM with the removed natural and artificial depressions to avoid numerical problems in algorithms of the gravity flow. The pit removal procedure changes geomorphometry of the DTM. GIS software packages use pit removal algorithm independently of geomorphmetric features of the analyzed area. In need of minimally modified DTM after the pit removal areas, the carving method (deepen drainage routes) and the filling method (fill sink) were analyzed on three different geomorphometric areas (bare mountain range, hilly wooded area and the plain area intersected with the network of the drainage canals). The recommendation is given for the choice of geomorphometric least changing DTM algorithm. The input data are raster data of elevation points created by stereoscopic photogrammetry method in 5x5 and 25x25 meter resolution. Differences have been noticed during the process of creating raster data. The recommendation is given for the choice of the most acceptable method for each type of area on the basis of comparison of the original elevation points with the elevation points in created DTM.
Original Text (This is the original text for your reference.)
ANALYSIS OF THE PIT REMOVAL METHODS IN DIGITAL TERRAIN MODELS OF VARIOUS RESOLUTIONS
Digital terrain model (DTM) is the base for calculation of the surface runoff under the influence of the gravity (gravity flow) in hydrological analysis. It is important to produce hydrologically corrected DTM with the removed natural and artificial depressions to avoid numerical problems in algorithms of the gravity flow. The pit removal procedure changes geomorphometry of the DTM. GIS software packages use pit removal algorithm independently of geomorphmetric features of the analyzed area. In need of minimally modified DTM after the pit removal areas, the carving method (deepen drainage routes) and the filling method (fill sink) were analyzed on three different geomorphometric areas (bare mountain range, hilly wooded area and the plain area intersected with the network of the drainage canals). The recommendation is given for the choice of geomorphometric least changing DTM algorithm. The input data are raster data of elevation points created by stereoscopic photogrammetry method in 5x5 and 25x25 meter resolution. Differences have been noticed during the process of creating raster data. The recommendation is given for the choice of the most acceptable method for each type of area on the basis of comparison of the original elevation points with the elevation points in created DTM.
+More
area calculation of the surface runoff filling method fill problems raster data of elevation points hydrologically corrected dtm dtm gis software packages terrain model the gravity gravity stereoscopic photogrammetry method pit removal algorithm pit removal procedure least changing dtm hydrological analysis carving method deepen drainage routes minimally modified dtm algorithms removed natural and artificial depressions
APA
MLA
Chicago
,.ANALYSIS OF THE PIT REMOVAL METHODS IN DIGITAL TERRAIN MODELS OF VARIOUS RESOLUTIONS. XLI-B2 (),.
Select your report category*
Reason*
New sign-in location:
Last sign-in location:
Last sign-in date: