Marathon geologists in the field. Credit: Marathon Gold
With a resource estimate for the Berry zone at Marathon Gold’s (TSX: MOZ) Valentine gold project underway, the company has released assay results from its 2021 drilling for seven holes drilled within the 1.5-km target. The latest results include a deeper drill hole assay from the less-explored central portion of Berry that returned 22 metres of 6.57 g/t gold starting at 232 metres.
Additional drill highlights include 21 metres of 3.93 g/t gold; 3 metres of 14.93 g/t gold; and 12 metres of 1.75 g/t gold.
Original Text (This is the original text for your reference.)
Marathon geologists in the field. Credit: Marathon Gold
With a resource estimate for the Berry zone at Marathon Gold’s (TSX: MOZ) Valentine gold project underway, the company has released assay results from its 2021 drilling for seven holes drilled within the 1.5-km target. The latest results include a deeper drill hole assay from the less-explored central portion of Berry that returned 22 metres of 6.57 g/t gold starting at 232 metres.
Additional drill highlights include 21 metres of 3.93 g/t gold; 3 metres of 14.93 g/t gold; and 12 metres of 1.75 g/t gold.
Comments
Something to say?
Log in or Sign up for free